Full basement finishing in West Jordan: the job in ten steps

Finishing a whole basement in West Jordan: the ten stages, radon and moisture first, the city's ceiling and insulation rules, then a contractor match.

Work
Basement finishing
Area
West Jordan, including Copper Hills, Welby, Jordan Hills and Jordan Landing, plus nearby Taylorsville and Kearns.
Checked
November 2026

Below is the order a full basement finish usually runs in, with the West Jordan rules that touch each step. A licensed contractor does the work. West Jordan Basement Finishing is a referral service that puts homeowners in touch with one.

Before step one: two tests

Both of these come before any wall goes up.

The ten steps

  1. Walk-through and design. The contractor measures the space and notes the furnace, water heater, water main, sewer cleanouts and electrical panel. Those must stay reachable. You mark which rooms will be bedrooms.
  2. Ceiling plan. Utah's adopted IRC requires 7 feet of ceiling height in habitable space, and lets beams, ducts and other obstructions drop to 6 feet 4 inches above the finished floor (UpCodes' third-party copy of the code). West Jordan's Basement Finish Guide repeats the 7 foot minimum and says surface-mount lighting and other projections must not encroach into it. Where the two differ for a low beam or duct, ask the plans examiner at 801-569-5050 which applies.
  3. Permit and plans. A floor plan goes to the city. See the West Jordan permit steps.
  4. Egress windows. The code requires at least one emergency escape opening in a basement and one in each basement bedroom, with a window well where the opening is below grade. This is the dirtiest and most structural step. See egress windows and window wells.
  5. Framing. Walls go in from the concrete, with a pressure-treated bottom plate where wood touches the slab, then interior walls, soffits around ducts and fireblocking in the wall cavities.
  6. Rough-ins. Electrical, plumbing and heating-and-cooling runs go in while the walls are open. These are separate trades. Under Utah Code 58-55-305, electrical or plumbing work must be done by a licensed electrical or plumbing contractor.
  7. Rough inspection. Ask Building & Safety at 801-569-5050 which inspections your permit needs before anything is covered.
  8. Insulation. Utah's amended IRC sets the minimum for basement walls around conditioned space at R-10 continuous or R-13 cavity. The city's guide asks for R-13 at exterior walls. Ask Building & Safety at 801-569-5050 which applies to your plan.
  9. Drywall and finishes. Hang, tape, sand and paint, then doors, trim, flooring, cabinets and fixtures. Stairs get their work here too. Utah's stair amendment sets a maximum riser of 8 inches and a minimum tread of 9 inches, and the IRC wants 6 feet 8 inches of headroom over the stairway (UpCodes' third-party copy of the code).
  10. Final inspection. Ask the contractor to show you that the final inspection has passed before the space is used.

Alarms, written into the plan

Smoke and carbon monoxide alarms are on the city's Basement Finish Guide, so they belong on the drawing from step one.

  • Battery-backed, interconnected 120-volt smoke detectors in every bedroom and in the hallways leading to them (city guide).
  • One CO detector, or a combination smoke/CO detector, per floor (city guide).
  • Interconnection so one alarm sets off all of them. The IRC allows listed wireless interconnection, but West Jordan's guide still calls for 120-volt, battery-backed detectors.

State rules go further. Utah amended the IRC so carbon monoxide alarms go on each level of the dwelling and outside each sleeping area. The IRC also requires smoke alarms in each bedroom, outside each sleeping area and on each story of the home, including the basement, and Utah's amendment says that when alterations, repairs, accessory dwelling units or additions needing a permit are done, the whole dwelling unit gets smoke alarms placed as for a new home (UpCodes' third-party copy of the code). So a finish with no bedroom still needs a smoke alarm on the basement level. Ask the contractor how the plan satisfies both the guide and these rules, and ask Building & Safety at 801-569-5050 which one the city reviews against.

What goes wrong in a basement finish

  • Finishing over a damp wall, then growing mold behind drywall.
  • A ceiling that ends up too low because a duct or beam was ignored.
  • Carpet laid straight on a cold slab.
  • A new wall package that changes airflow around a gas furnace or water heater. Ask the contractor how combustion air to the mechanical room is handled and where the plans show it.
  • A bedroom with no legal escape window, which can cause trouble at resale.

Questions to ask before you sign

  • Is your license active, and in which classification? You can check it on the state lookup.
  • Who pulls the permit, and how many inspections do you expect?
  • Will electrical, plumbing and heating work be done by licensed trades?
  • Did you check for moisture, and do you recommend a radon test before framing?

Price context is on the cost page.

Common questions

Does the job need a permit in West Jordan?

Yes, treat it that way. The city's Basement Finish Guide is headed "Basement Finish Permits (Common code requirements only)", and its basement-apartment checklist asks whether a permit was obtained to finish the basement. As background, the IRC requires a permit to alter a building or to install or alter electrical, gas, mechanical or plumbing systems (UpCodes' third-party copy of the code). Confirm what your job needs with West Jordan Building & Safety at 801-569-5050, because rules and fees change.

Can you check a contractor's license?

Yes. The state's Licensee Lookup and Verification System is free and online, and the check is yours to make before signing.

To start, call (385) 255-7293 or send the request form. A match costs you nothing.

Where these rules come from

The ceiling, insulation and alarm items are from West Jordan's Basement Finish Guide, read in November 2026, and the state code links are above.

Start a basement finishing request

Tell us about the basement. Your request goes to a licensed local basement finishing contractor, who may call or text you.

Rough size, what you want down there (bedroom, family room, bath) and when you would like to start.