Licensed trades do the plumbing, wiring and tile. West Jordan Basement Finishing is a referral service that passes your request to a licensed local contractor. This page is a checklist of what a basement bathroom involves in West Jordan, so you can compare quotes.
The pieces below are separate decisions. Settle them in this order.
Step 1: where the water goes
A basement bathroom can sit below the sewer line, or close to it. There are two common answers.
- Cut the slab. The contractor cuts a trench in the concrete floor, runs new drains in it and patches it.
- Pump it up. An up-flush unit or an ejector pump lifts waste to the drain above.
Which one fits depends on where the main drain runs and how deep it is. Ask the contractor to say which they propose and why, and to itemize the plumbing as its own line.
The slab cut is also the moment to check the floor for moisture. The EPA says to fix moisture problems before other work begins in a basement conversion. If you have not tested for radon, a cut slab is a reason to do it first. The EPA says fixing a radon problem is usually easier and cheaper before the basement is finished.
Step 2: a window or a fan
The IRC's R303.3 asks a bathroom to have at least 3 square feet of window, half of it openable, or else artificial light and an exhaust fan whose air goes directly to the outdoors (UpCodes' third-party copy of the code). A basement bathroom with no window takes the fan route. The duct has to reach outside, which in a basement can mean a run through the rim joist to a wall cap. Ask the contractor to show the fan and its duct on the plans submitted to the city.
Ask the contractor where the fan duct will exit and who will cut the hole.
Step 3: the licensed trades
Three trades meet in a bathroom, and they are separate licenses.
- Plumbing. Under Utah Code 58-55-305, plumbing or electrical work must be done by a licensed plumbing or electrical contractor even where a small remodel is otherwise exempt from licensing. The exemption is for remodeling or improvement work with a contracted value under $7,000, counting labor, materials and all change orders.
- Electrical. Under the same Utah Code section, the wiring must go to a licensed electrical contractor; ask which one will do it.
- General contractor. A residential and small commercial contractor is defined in Utah Code 58-55-102 as one licensed to build single-family homes, excluding plumbing, electrical and mechanical work. So the license that covers framing does not cover the drains; ask which licensed plumber will do them.
Do not hire out any part of this to an unlicensed worker. Check each license yourself on the state's lookup.
Step 4: the permit
A bathroom adds a plumbing system, and the IRC requires a permit for installing or altering a plumbing system (UpCodes' third-party copy of the code). West Jordan Building & Safety at 801-569-5050 can say whether it goes on the same application as the rest of the finish, and rules and fees change, so ask before you apply. See the permit page.
Step 5: the finish
Floor, wall, ceiling and fixtures go in after the inspections your permit needs; ask Building & Safety at 801-569-5050 which those are. If the bathroom is on an exterior wall, the insulation rule applies there too. Utah's amended IRC sets R-10 continuous or R-13 cavity for basement walls around conditioned space.
What the benchmark job includes
The Cost vs Value report's basement remodel is a 20-by-30-foot entertaining area with a wet bar and a 5-by-8-foot full bathroom. So a bathroom is part of the job behind the Salt Lake City benchmark on the cost page. Ask any contractor to price the bathroom as its own line, because a real quote depends on your house.
Questions for the contractor
- Slab cut or pump, and why?
- Where does the fan duct exit?
- Which licensed plumber and electrician are on the job?
- What happens if the trench shows water in the slab?
- Which inspections cover the bathroom?
Common questions
Does a toilet installation need a permit?
Adding a toilet as part of a new bathroom installs plumbing, which the IRC says needs a permit first; for replacing an existing toilet, ask Building & Safety at 801-569-5050.
Does the basement need a full bath?
Ask the plans examiner about bathroom type and size, since the city decides what it reviews.
Where these rules come from
The state rules are from the linked Utah Code pages and from UpCodes' third-party copy of the Utah-amended IRC, read in November 2026. To ask for a match, call (385) 255-7293 or send the request form.